Installation

There are only two units required to build you planter or garden wall. Notice that some of the copings (when turned upside down) have a splitting groove which can be used for making corner pieces. If corners are not required use a chisel to break out the center nub and use as a coping piece.

Prepare Base
Excavate trench 200mm (8") deep and 400mm (16") wide.  Place and compact gravel to 100mm (4") depth.
First Course
Place only standard units on gravel base.  Ensure units are level from back to front and from side to side.
Stack Units
Stack units along wall.  Coping units can be used in the wall, but should not be stacked on other coping units without adhesive.
Placing Coping
Place a line of adhesive in front of and behind the tongue on the second last course.  Position coping stones on top.
NOTES TO PRODUCT NOMINAL DIMENSIONS, WEIGHTS AND PACKAGING TABLES:
  • All dimensions are based on Metric Units with soft conversion to Imperial.
  • All dimensions include a 3 mm (1/8 in) joint.
  • Areas per bundle are calculated on the mold manufacturers dimensions with an allowance for standard sand joints.
  • All product packaged on pallets.
  • f you require more information on this or any other service, please contact our office.